Standard

SAE AS683E

Current

Existing or new amendments and versions must be purchased separately.

Language
Services

Abstract

These procedures cover the following: Section 3 - Cone end connections for flared tube and brazed ferrule, with and without gasket. Section 4 - Boss end connections, positioned type, with back-up ring. Section 5 - Boss end connections, positioned type, without back-up ring. Section 6 - Boss end connections, non-positioned type. Section 7 - Bulkhead connections.

Products specifications

  • Standard from SAE International
  • Published:
  • Document type: IS
  • Pages
  • Publisher: SAE International
  • Distributor: SAE International

Product Relations